Project database
Investment projects in Kazakhstan
Browse and filter the full catalogue. Opening a record — scope, investment value, timeline, sources and the companies behind it — requires premium.
Have a project? List it and find a partner.
Post your project free — members can make offers on the exact work you need (EPC, supply, finance…).
A free account opens 3 full projects. Companies, named contacts, direct phone and email — no card needed.
Mining & MetallurgyFull record lockedMiryildiz Gold and Copper Mining Facility
East Kazakhstan
, involves the development of a combined gold and copper mining and processing facility in the Zhanan-Boko–Zaisan ore zone in Eastern Kazakhstan. The complex will integrate both extraction and processing operations, leveraging Miryıldız Mining’s experience across multiple countries including Turkey, CAR, Sierra Leone, and Gambia.
Mining & MetallurgyFull record lockedTungsten Mining & Processing Project (Updated)
S. investment firm Cove Capital LLC. 4 million tonnes of tungsten trioxide (WO₃) equivalent under JORC standards.
Mining & MetallurgyFull record lockedRaygorodok Gold Mining & Processing Project
The Raygorodok Gold Mining and Processing Project is a large-scale development located in the Burabay District of Akmola Region, Kazakhstan. The project involves the acquisition and expansion of the Raygorodok gold and copper deposit, including both the North and South open-pit mines. A heap-leach facility was commissioned in 2016 and a carbon-in-pulp processing plant was launched in 2022.
Mining & MetallurgyFull record lockedWorld’s Largest Undeveloped Tin Deposit
The project involves constructing a large‑scale mining and metallurgical facility at the Syrymbet deposit in the Aiyrtau (Айыртау) District of the North Kazakhstan Region, Kazakhstan. The facility is designed to exploit one of the world’s largest undeveloped tin (Sn)‑rich polymetallic deposits, with tin as the major component and significant by‑products including copper, tungsten and fluorite.
Mining & MetallurgyFull record lockedAsia United Steel Plant
Almaty
Asia United Steel is building a green steel plant in Almaty Region, Kazakhstan, with an annual production capacity of 1 million tonnes of steel. The project utilizes Direct Reduced Iron (DRI) technology, replacing coke with natural gas, reducing carbon emissions by more than 60% per tonne of steel. The plant will mainly produce strip steel, rebar pipes, galvanized steel, sectional steel lines, and other products.
Mining & MetallurgyFull record lockedVerkhuba Copper Project
East Kazakhstan
The Verkhuba Copper Project is a mining development initiative focused on advancing the Verkhuba copper deposit in eastern Kazakhstan toward commercial production. The project is governed by a binding Heads of Agreement (HoA) between East Star Resources Plc and Hong Kong Xinhai Mining Services Limited, establishing a joint venture company (JVCo) to finance, design, and construct the mining and processing facilities.
Mining & MetallurgyFull record lockedQarmet Lisakovsk Tailings Processing Plant.
Kostanay
The Lisakovsk project is a major industrial initiative to build two processing plants for recycling iron ore tailings and other secondary iron‑bearing materials in Lisakovsk, Kazakhstan. It aims to convert historic stockpiles of iron ore processing waste into usable iron ore concentrate for metallurgical use, improving resource efficiency and environmental sustainability.
Mining & MetallurgyFull record lockedERG Gallium Extraction and Production Facility
Pavlodar
The project involves construction of a new industrial facility for extracting and producing gallium, a critical metal used in semiconductors and high‑technology applications, at the existing Pavlodar Alumina Plant in Kazakhstan. The facility will utilize ERG’s proprietary technology to extract gallium from alumina production residues (red mud), enabling the recovery of high‑purity gallium even from low‑concentration solutions.
Mining & Metallurgy+1Full record lockedKomatsu Component Rebuild Center
Akmola
The Komatsu Component Rebuild Center (CRC) is a strategic industrial facility under construction in Astana, Kazakhstan, intended to serve as the largest Komatsu service and component overhaul hub in Central Asia. The project focuses on full‑cycle repair, refurbishment, and testing of key components of heavy mining and construction equipment — including engines, transmissions, hydraulic systems, and electrical units.
Open any record in full
Premium unlocks every project page — scope and description, investment value, timeline, verified sources, and every involved company with named decision-makers, direct phones and emails.