Project database
Investment projects in Kazakhstan
Browse and filter the full catalogue. Opening a record — scope, investment value, timeline, sources and the companies behind it — requires premium.
Have a project? List it and find a partner.
Post your project free — members can make offers on the exact work you need (EPC, supply, finance…).
A free account opens 3 full projects. Companies, named contacts, direct phone and email — no card needed.
Energy & Power Generation+1Full record lockedZeta Wind Farm
Aktobe
Zeta Wind Farm refers to a planned large-scale renewable energy project in the Aktobe Region of the Republic of Kazakhstan, targeting a total installed capacity of approximately 300 MW of wind power. It is part of a broader initiative to expand renewable energy and reduce reliance on fossil fuels, supporting regional grid stability and clean energy targets. , Ltd.
Energy & Power GenerationFull record lockedSecond Nuclear Power Plant
Almaty
The Republic of Kazakhstan has officially approved the construction of its Second Nuclear Power Plant, formalised by Government Resolution No. 40 signed on 26 January 2026 by Prime Minister Olzhas Bektenov. The plant is part of Kazakhstan’s strategy to diversify its national energy mix and address regional electricity deficits by adding reliable base-load nuclear capacity.
Energy & Power GenerationFull record lockedTwo Hydropower Plants in the Zhetisu Region
Jetisu
The project involves the construction of two small hydropower plants — Rudnichny HPP-1 and Rudnichny HPP-2 — in the Kerbulak district of the Zhetisu Region, Republic of Kazakhstan. The total installed capacity of the cascade is 42 MW, including 19 MW for HPP-1 and 23 MW for HPP-2. 3 million kWh.
Mining & Metallurgy+1Full record lockedSarykum Anthracite Coal Mining Project
Karaganda
The Sarykum project involves the development of an anthracite coal deposit in the Karaganda region of Kazakhstan, near Lake Balkhash. The project aims to exploit high-quality anthracite, which is rare in Kazakhstan, suitable for use in metallurgical processes, electrodes, absorbents, and electrocorrundum production. Lower-grade coal will supply local residential and municipal energy needs.
Energy & Power Generation+1Full record lockedConstruction of Hydropower Plant on the Baskhan River
Almaty
The project involves the construction of a cascade of small hydropower plants on the Baskhan River in the Sarkand District of the Zhetysu Region of Kazakhstan. The development includes two derivation-type hydropower stations designed to utilize the river’s flow through a water intake structure and pressurized pipelines. Each station will contain a single horizontal hydro-unit consisting of a turbine and generator.
Energy & Power Generation+1Full record lockedAktau 500MW CCGP Plant
Mangystau
The Aktau Combined Cycle Gas Power Plant Expansion is a planned large-scale energy infrastructure project aimed at constructing two combined-cycle gas turbine (CCGT) units with a total capacity of 500 MW in Aktau, Mangystau Region, Kazakhstan. , Ltd.
Water & Environment & Waste+1Full record lockedWaste-to-Energy Plant “Energy of Astana”
Astana
The project involves the construction of a waste-to-energy (WtE) plant in Astana designed to process municipal solid waste and generate electricity. It is part of a broader eco park concept aimed at modernizing the city’s waste management system. The facility will process approximately 1,500 tons of waste per day, equivalent to around 550,000 tons annually.
Energy & Power Generation+1Full record lockedAlmaty Waste-to-Energy Plant (Updated)
Almaty
The project is a large-scale Waste-to-Energy (WtE) facility planned in Almaty, Kazakhstan, designed to convert municipal solid waste into electrical energy through thermal treatment. The plant is expected to process up to 2,000 tons of waste per day, significantly reducing landfill dependency in the city. It will generate approximately 60 MW of electricity, which is intended to be integrated into the local power grid.
Renewable Energy+1Full record locked100 MW Wind Power Plant in Aktobe
Aktobe
The project involves the development of a new 100 MW wind power plant in Aktobe Region, Kazakhstan. The project was selected through Kazakhstan’s renewable energy auction mechanism for wind power projects in the Northern Zone of the Unified Power System of Kazakhstan. On 19 May 2026, KOREM JSC held the auction for a 100 MW wind power plant construction project.
Open any record in full
Premium unlocks every project page — scope and description, investment value, timeline, verified sources, and every involved company with named decision-makers, direct phones and emails.