Energy & Power Generation+1Full record locked300 MW Solar Power Plant Turkistan Region (Updated)
The project involves the construction of a utility-scale solar photovoltaic power plant in the Sauran District of Turkistan Region, Kazakhstan. The officially stated installed capacity is 300 MW AC, with an energy storage system included in the project scope.
Energy & Power Generation+1Full record locked1 GW Wind Power Plant in Zhambyl Region (Updated)
Masdar, a renewable energy company from the United Arab Emirates (UAE), intends to build a 1 GW wind power plant in the Zhambyl region of Kazakhstan. The Governor of Zhambyl region, Yerbol Karashukeyev, met with representatives of Masdar to discuss the details of the project implementation. 40 billion.
Energy & Power GenerationFull record lockedConstruction of a new power unit CHPP-3
Karaganda
6 billion tenge has started in Karaganda. The project will become a powerful impetus for the industrial, social and economic development of the region. The commissioning of the power unit will provide Karaganda with an additional 140 megawatts of electricity and 180 gigacalories of heat per hour.
Energy & Power GenerationFull record lockedFirst Nuclear Power Plant (Updated)
Almaty
The official start of work on the construction of the first nuclear power plant in the history of Kazakhstan took place near the village of Ulken in the Almaty region. The event was attended by Alexey Likhachev, Director General of the Rosatom State Corporation, Almasadam Satkaliyev, Chairman of the Atomic Energy Agency of the Republic of Kazakhstan, and Marat Sultangaziev, Akim of the Almaty region.
Energy & Power GenerationFull record lockedVarvarinskoye Hub Hybrid Power Project
The Varvarinskoye Hub project involves the construction of a ~23 MW solar photovoltaic plant paired with up to ~40 MW gas‑piston (gas‑engine) power station. The hybrid configuration is designed to ensure stable electricity supply for Solidcore Resources’ mining operations, using solar power during the day and gas‑piston generation to balance intermittent solar output.
Energy & Power GenerationFull record locked50 MW Combined-Cycle Power Plant, Auliekol
Jambyl
This project involves the construction of a 50 MW combined-cycle (steam + gas) power plant in the village of Auliekol, Zhambyl District, Zhambyl Region, Kazakhstan. It is being developed by GES Myrzatai LLP with an investment of US$ 60 million. The project will be implemented in two phases: the first phase is 50 MW, and the second will expand capacity by another 150 MW, bringing the total to 200 MW.
Energy & Power GenerationFull record lockedExpansion of Ust‑Kamenogorsk CHP
East Kazakhstan
The project involves the expansion of the existing Ust‑Kamenogorsk Combined Heat and Power (CHP) plant to address acute shortages in electrical and thermal energy supply in the East Kazakhstan region. It foresees the installation of a new turbine unit (No. 13) with a capacity of 100 MW and a boiler unit (No.
Energy & Power GenerationFull record lockedTurkestan 1000 MW CCGT Power Plant
Turkistan
The Turkestan 1000 MW Combined-Cycle Gas Power Plant is one of Kazakhstan’s largest ongoing power generation projects, aimed at strengthening the energy security of the southern regions. The project involves the construction of a modern combined-cycle gas turbine (CCGT) facility with a total installed capacity of approximately 1,000 MW.
Energy & Power GenerationFull record lockedKurchatov 700 MW Coal-Fired Power Plant (Updated)
Abay
The project involves the construction of a new 700 MW coal-fired condensing power plant in Kurchatov, Abai Region, Kazakhstan. The project was tendered by the Ministry of Energy of Kazakhstan under the national policy to expand coal-based base-load generation and the electricity sector development plan to 2035.