Astana Water Supply System Expansion — project photo

Astana Water Supply System Expansion

Astana (city), Kazakhstan

Investment valuePremium
Current phaseProcurement & Construction
TimelinePremium
Record statusVerified
8,760 views

Project phase

Stage 3 of 4

  1. Initiation & Feasibility
  2. Engineering Design & Planning
  3. Procurement & ConstructionCurrent
  4. Commissioning & Operation

Overview

About this project

The project is a large-scale EPC infrastructure development aimed at strengthening the drinking water supply system of Kazakhstan’s capital, Astana. It involves the construction of a 205 km raw water transmission pipeline from the Kanysh Satpaev Canal system to the city of Astana, along with multiple pumping stations and a major water treatment facility (NFS-4).

Open this project free

A free account opens three complete project records — companies, named decision-makers, direct phone and email. No card, no trial period. See the real data before you decide whether it is worth paying for.

  • The rest of the descriptionCapacity, technology, financing, current status and what happens next.
  • Investment value and timelineAnnounced value, start and completion dates, status and last verification.
  • Every involved companyOwner, investor, engineering and EPC contractors, operator, government bodies.
  • Named decision-makersWho to speak to, with direct phone, email and LinkedIn.
  • Verified sourcesThe primary sources behind each fact, so you can check it yourself.

Already have an account? Sign in to use your free unlocks.

Related

Other projects in Water & Environment & Waste

Water & Environment & WasteFull record locked

Taraz Water Treatment Plant (WWTP) Modernization

Jambyl

The project involves the design and construction of a modern wastewater treatment plant in Taraz, Kazakhstan, with a treatment capacity of 80,000 m³ per day. The initiative aims to replace outdated filtration lagoons, thereby improving wastewater treatment and sludge management in line with national and EU standards.

Initiation & FeasibilityRead more
Energy & Power Generation+1Full record locked

Almaty Waste-to-Energy Plant (Updated)

Almaty

The project is a large-scale Waste-to-Energy (WtE) facility planned in Almaty, Kazakhstan, designed to convert municipal solid waste into electrical energy through thermal treatment. The plant is expected to process up to 2,000 tons of waste per day, significantly reducing landfill dependency in the city. It will generate approximately 60 MW of electricity, which is intended to be integrated into the local power grid.

Procurement & ConstructionRead more
Water & Environment & WasteFull record locked

Baiterek Holding and BlueGen Ltd Investment Cooperation in Water Infrastructure

Baiterek Holding, Kazakhstan's key development institution, is exploring investment cooperation with BlueGen Ltd, an Israeli company specializing in environmental solutions, particularly in water resources, wastewater treatment, and desalination. This collaboration aims to enhance Kazakhstan's water infrastructure by constructing and modernizing wastewater treatment facilities (WWTF) across the country.

Engineering Design & PlanningRead more